HMD307 College of Southern Nevada Activity Based Costing Project

Business Finance

Hi this is me again.

I have an urgent request to you

I need excel file of ABC project that you’ve done before for me.

I know you gave me both word and excel files, but professor accept only excel file.

so can you please put everything more clearly on excel file?

I will attach both files that you did.

please arrange it in below order

1. Title page (1 pg)

2. Contribution margin menu engineering summary (1pg)

3. ABC step 1 summary displaying the following information: a. Total cost per cost pool b. Cost pool rates (1pg)

4. Bill of activity report for each menu item category (4 pages)

5. Bill of activity summary report for all menu items (1 page)

6. ABC menu engineering summary (1 page)

7. Written analysis of the results from the two menu engineering summaries (Include a detailed explanation of how ABC works using figures from your quantitative analysis)

I need this asap

thank you